Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


JPMorgan Taps Architect for Tower Replacement

Monday, November 5, 2018

More items for Maintenance + Renovation

Comment | More

JPMorgan Chase is moving along with its plan to knock down its 705-foot-tall, 52-story home to make way for a new building that’s slated to be 500 feet higher. The company just announced that U.K.-based firm Foster + Partners will serve as the lead architect on the project.

What’s Happening

In February, the company announced its intention to demolish the iconic 270 Park Avenue skyscraper, which was designed by Natalie de Blois and Gordon Bunshaft of architecture firm Skidmore, Owings & Merrill and completed in 1961.

The project is slated to be the world’s largest building to be deliberately destroyed.

Equipped with steel ribs, glass panels and black spandrels, 270 Park Avenue also features a two-level lobby that was designed as a workaround for the railroad tracks that ran underneath the structure from Grand Central Station. To create this, columns had to be sunk between the tracks, and the elevator block had to be placed above ground.

Despite undergoing renovations to be brought up to LEED Platinum standards in 2012, the company says that the structure no longer suits the company’s needs, as it is not large enough to house their growing workforce. Currently, 6,000 employees are working in a building intended for 3,500.

The new skyscraper, also slated to be fully LEED-certified, would both provide an additional 1,000,000 square feet of space and room for another 9,000 employees. Construction of the tower would also reportedly create 8,000 construction-related jobs while the structure was being built.

Though designs for the new building have not been released to the public yet, JPMorgan says that it hopes to start construction next year, pending plan approval. A provisional completion date of 2024 has also been set.

The plan is not without criticism. Earlier this year, architecture critic Paul Goldberger said he was “speechless” in light of the news, and fellow critic Justin Davidson also said that demolishing “one of the peaks of modernist architecture in the name of modernity is obscene, a sign that you consider your city disposable.”

   

Tagged categories: Condominiums/High-Rise Residential; Construction; Demolition

Comment from john lienert, (11/5/2018, 6:18 AM)

Gonna' be sinking like San Fran's new condo-scraper downtown....beware


Comment from Robert Bullard, (11/5/2018, 9:01 AM)

New Yorkers will suffer through this for several years because JPMorgan Chase has more money than God.


Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Dow Coating Materials
 
Need smooth, durable and appealing coatings?
 
Dow Corning® 52 Additive improves abrasion resistance & slip in:
• Waterborne paints, inks &
  coatings
• Wood coatings
• OPVs
• Exterior & interior paints
Samples available.
 

 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved