Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Largest Timber U.S. Office Building Slated for NJ

Wednesday, February 7, 2018

More items for Building Envelope

Comment | More

Renderings for the largest mass timber office building in the United States have just been released by New York-based developer Lotus Equity Group and Vancouver firm Michael Green Architecture.

Images: Lotus Equity Group and Michael Green Architecture

Riverfront Square, as it’s being called, will include up to 2,000 residential units, retail shops, cultural and public open space, a hotel, a total of 2 million square feet of office space and parking.

The project, located in Newark, New Jersey, at the site of the former Riverfront Stadium, will be 11.8 acres of mixed-use buildings. The 11-story anchor office is slated to contain up to 500,000 square feet of Class A office space.

The Site

Riverfront Square, as it’s being called, will include up to 2,000 residential units, retail shops, cultural and public open space, a hotel, a total of 2 million square feet of office space and parking.

“To build the nation’s largest timber building in Newark speaks to the confidence and belief we have in the city and Riverfront Square as a world-class location that can compete with any great city around the world,” said Ben Korman, Chief Executive Officer and Founder of Lotus Equity Group.

“The vision we share with Michael Green is to design the most environmentally sustainable office tower that enhances the health of tenants and the surrounding communities through efficient planning and green design. When you merge these benefits with Newark’s emerging technology sector, Riverfront Square is primed to help companies attract and retain valuable talent.”

The firms said that they went with the mass timber design because of the sustainability that timber presents, noting, however, that the foundation will be concrete.

The renderings show the structure rising like steps in three different sections of six, eight and 11 stories. The facade cladding materials have yet to be determined, but could include metal panels, brick or wood.

The renderings show the structure rising like steps in three different sections of six, eight and 11 stories. The facade cladding materials have yet to be determined, but could include metal panels, brick or wood.

“This project represents an opportunity for MGA, in collaboration with Lotus Equity Group, to lay the foundation for the future of Riverfront Square and the city of Newark more broadly. Good buildings are good neighbors and we envision a sustainable, efficient and architecturally stunning future for Newark,” said Michael Green, Founder and Principal of Michael Green Architecture.

Moving Forward

Though mass timber is the plan, Newark’s building code actually limits heavy timber construction to six stories, according to a report by the Wall Street Journal. A spokesperson from Lotus cites local code exemptions made in other states, however, and expects New Jersey to be open to similar exemptions.

The developer also still needs to find a tenant before construction can begin, however, which is expected to take about 20 months.

Along with MGA (which designed the nation’s current largest mass-timber building in Minneapolis) other firms slated for the project include TEN Arquitectos, Practice for Architecture and Urbanism, Minno & Wasko Architects and Planners and James Corner Field Operations.

   

Tagged categories: Architecture; Sustainability; Wood

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Garland Company
 
Architectural Wall Coating Damproofs and Beautifies
 
Tuff-Coat™ multi-functional coating bridges hairline cracks, hides stains and discoloration, and reduces wall temperature, increasing the wall's life cycle.
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
EMME Controls
 
EMME (Energy Management Made Easy)
 
• Achieve a zone in every room for 1/2 the cost
• Save up to 40% in energy consumption
• Works in any size building
• Can be installed in as little as a few days without remodeling
• Comfort results guaranteed in writing
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved