Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Firms Hired for Obama Center, Renderings Released

Monday, January 15, 2018

More items for Building Envelope

Comment | More

An updated design for the Obama Presidential Center was released late last week, arriving on the heels of the announcement that a collective of diverse construction firms had been hired to take on the project.

The design, created by Tod Williams Billie Tsien Architects|Partners, with landscape architecture by Michael Van Valkenburgh Associates, was first introduced in May 2017. The complex will be located in Jackson Park, on Chicago’s South Side.

Complex Design

The 19.6-acre complex will be composed of six parts: a public plaza, an athletic center, a museum, a library, the Forum community and event building and a parking facility. The latter was initially proposed as an above-ground parking garage, but has since been relocated underground to the south of the library, due to community backlash.

The main cluster of buildings include the museum tower, the Forum and the library, and all would be connected by a basement level that would receive natural light through sunken openings, noted the Chicago Tribune.

The updated design also features a thinner museum tower which is also taller, shouldering its way from 178 feet tall to 235 feet tall. The tower will also feature outside walls that consist of screens of stone letters, with a window in the north facade and an increase in below-grade space.

As it stands, plans for the athletic center feature a low-slung, two-level rectangular building topped by a curving, free-form roof, housing space for basketball, dance and other sports, as well as community meeting and workout rooms. A glass facade located to the south would overlook an outdoor running track.

The Obama Foundation is also in talks to install a branch of the Chicago Public Library in the complex library building.

On top of this, the Forum building will also include a 300-seat auditorium, as well as a restaurant.  

Construction Firms

The $300 million contract for the construction of the complex was awarded to the Lakeside Alliance, which is composed of Powers & Sons Construction Co., Turner Construction Co., Brown & Momen, UJAMAA Construction and Safeway Construction Co, noted the Chicago Tribune.

The collective was formed more than two years ago to pursue the project, and was announced as one of four finalists in August 2017.

In hiring the collective, the Foundation sought to ensure that the endeavor benefitted local residents, with money involved staying close by. There was also a focus on diversity in the hiring process, as many of the businesses in the collective are owned by African Americans. This move was also a step away from the established trend of minority-owned businesses having a difficult time acquiring these large projects.

“We hope that this becomes a model, so that as this high-profile, significant project is developed and is successful, people can use it to show: ‘President Obama had this kind of diversity in his project, we should have it in ours,’” noted Foundation vice president for civic engagement Michael Strautmanis.

The Foundation will formally submit the updated design to the Chicago Planning Commission, in hopes to break ground by the end of the year, with the Center opening in 2021. The Presidential Center is anticipated to cost $500 million, all of which will be raised privately, but public money will most likely have to be used to accommodate road improvements to handle traffic shifts brought on by construction.

   

Tagged categories: Design build; President Obama; Public spaces; Urban Planning

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
EMME Controls
 
EMME (Energy Management Made Easy)
 
• Achieve a zone in every room for 1/2 the cost
• Save up to 40% in energy consumption
• Works in any size building
• Can be installed in as little as a few days without remodeling
• Comfort results guaranteed in writing
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Garland Company
 
Architectural Wall Coating Damproofs and Beautifies
 
Tuff-Coat™ multi-functional coating bridges hairline cracks, hides stains and discoloration, and reduces wall temperature, increasing the wall's life cycle.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved