Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


VIDEO: Roof Completed at Madrid Stadium

Wednesday, September 6, 2017

More items for Building Envelope

Comment | More

Madrid’s new soccer stadium, which is slated to open in a few weeks, now has a completed roof as shown by time lapse video released by the construction company on the project.

FCC Construcción recently released the video that shows the installation of all 96 PTFE radial panels on the Atlético Madrid project named the Estadio Wanda Metropolitano.

Designed by architectural firm Cruz y Ortiz Arquitectos and supported by engineers at Schlaich Bergermann Partner, the roof took about four months to install.

The roof is oversized in style, and is made of two rings: a central double traction ring on the inside and a tridimensional double truss ring on the outer perimeter.

“A light roof covering spectators sits on the collection of stands like a large cloak,” notes a description on the architect’s website. “It can adapt to different situations and unifies the existing stadium and the extension.”

While the roof took a few months, the project began construction in 2011. With the bulk of the stadium complete, work now focuses on changes to a major highway near the project.

The goal is to have construction complete by Sept. 17, when Atlético Madrid is to face Málaga in its first scheduled home match of the season.

   

Tagged categories: Commercial Construction; Design build; Roofing contractors; Roofing materials; Stadiums/Sports Facilities

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
EMME Controls
 
EMME (Energy Management Made Easy)
 
• Achieve a zone in every room for 1/2 the cost
• Save up to 40% in energy consumption
• Works in any size building
• Can be installed in as little as a few days without remodeling
• Comfort results guaranteed in writing
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Garland Company
 
Architectural Wall Coating Damproofs and Beautifies
 
Tuff-Coat™ multi-functional coating bridges hairline cracks, hides stains and discoloration, and reduces wall temperature, increasing the wall's life cycle.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved