Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Cleveland to Consider Arena Upgrades

Monday, December 19, 2016

More items for Color + Design

Comment | More

The Cleveland Cavaliers, along with city and Cuyahoga County officials, are hoping to score approval of a $140 million renovation of its downtown Cleveland digs, authorities recently announced.

The Quicken Loans Arena, originally designed by Ellerbe Becket (now AECOM) and Robert P. Madison International Inc., a local architect, has been the Cavs’ home court since 1994. It is one of the oldest National Basketball Association arenas without a major update. 

Officials are proposing an expansive exterior and interior makeover of the existing event space, known as “The Q,” in order to make it more welcoming for its 2 million visitors per year.

Transformation
Cleveland Cavaliers

The project would improve visitor experience, providing 153,000 square feet of space, officials said. It was designed by architecture firms SHoP and ROSSETTI.

The renovation project, which adds a total of 153,000 square feet to the complex, was designed by New York-based SHoP Architects and ROSSETTI.

The arena would remain open during the construction, which if approved, is slated to begin in 2017 and be complete in two years.

Costs Split

According to project details, the reconstruction would modernize the structure with a glass front and add public gathering and dining spaces throughout. It would also address important structural and operational deficiencies in the facility.

The Cavs and the taxpayers would split the cost of the upgrades. Taxes on hotel rooms and The Q tickets would pay most of the public’s share, according to Cleveland.com.

Any cost overruns would be covered by the team, details note.

“This deal is crucial to continuing the great momentum the city and county are experiencing,” Cuyahoga County executive Armond Budish said in a statement.

Moreover, the project would also come with a guarantee that the Cavs would not leave the city through at least 2034.

The price tag compares to a $500 to $750 million range for a new arena.

Up for Vote

Officials will hold a serious of public hearings and vote on the proposed use of tax dollars, Cleveland.com reports. The City Planning Commission will consider the design proposal in upcoming public meetings.

The Cavs say that once the upgrade is complete, it will host an NBA All-Star Weekend and further make the stadium attractive for big-name concerts and other events.

Since the arena opened, the Cavs officials said they have spent more than $400 million in operating, maintenance and repair projects.

“Extending the life of The Q into the next decade and beyond is an efficient and responsible solution, and one that will provide a substantial return to our community,” Cavs and Quicken Loans Arena CEO Len Komoroski said.

“We are firmly committed to Cleveland and will continue to be aggressive in how we approach everything inside and outside The Q, with the goal being to continue impacting Cleveland’s great momentum in a very positive way.”

More information: www.TheQTransformation.com.

   

Tagged categories: Aesthetics; Architecture; Cladding; Commercial Construction; Construction; Design; Stadiums/Sports Facilities

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
EMME Controls
 
EMME (Energy Management Made Easy)
 
• Achieve a zone in every room for 1/2 the cost
• Save up to 40% in energy consumption
• Works in any size building
• Can be installed in as little as a few days without remodeling
• Comfort results guaranteed in writing
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Garland Company
 
Architectural Wall Coating Damproofs and Beautifies
 
Tuff-Coat™ multi-functional coating bridges hairline cracks, hides stains and discoloration, and reduces wall temperature, increasing the wall's life cycle.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved