Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Rio Olympic Buildings Make Progress

Tuesday, December 1, 2015

More items for Building Envelope

Comment | More

With just 250 days until the opening ceremony of the 2016 Olympics, construction on several of the Brazilian venues that will host the summer games have been completed.

Rio de Janeiro’s city government announced Nov. 18 that it had completed construction of three Olympic event venues: the Future Arena; the Olympic Golf Course; and Whitewater Stadium, which will host the canoe slalom events.

A time-lapse video shows construction work on Olympic venues in Rio de Janeiro. The city will host the 2016 summer games and the Paralympic games.

According to Swim Swam, which published a time-lapse video of the construction on its website, the buildings were completed despite a series of early setbacks, including worker strikes; pollution concerns; and rising costs of construction.

The Olympic Movement’s website noted that all three venues will contribute to the city after the games are complete. Future Arena will be dismantled, and its materials will be used for building public schools. The golf course will open to the public. And Whitewater Stadium will become part of public leisure facility.

While the Future Arena will host handball for the Olympic Games and goalball during the Paralympic Games—also set to be held in Rio—the golf course is perhaps most significant, according to the Olympic organizers. The course will host the first golf tournament in the Olympic Games in the past 112 years.

   

Tagged categories: Building design; Building envelope; Construction; Government; Stadiums/Sports Facilities

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
EMME Controls
 
EMME (Energy Management Made Easy)
 
• Achieve a zone in every room for 1/2 the cost
• Save up to 40% in energy consumption
• Works in any size building
• Can be installed in as little as a few days without remodeling
• Comfort results guaranteed in writing
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Garland Company
 
Architectural Wall Coating Damproofs and Beautifies
 
Tuff-Coat™ multi-functional coating bridges hairline cracks, hides stains and discoloration, and reduces wall temperature, increasing the wall's life cycle.
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved