Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Computer Art ‘Completes’ Olympic Park

Tuesday, July 14, 2015

More items for Color + Design

Comment | More

RIO DE JANEIRO--With less than a year before the Olympic torch arrives in Rio de Janeiro to kick off South America’s first attempt at hosting the Olympic Games, a newly released video may relieve concerns about the sports venues under construction.

The video, released by the Rio Municipal Government, shows that construction is well underway for nine venues at Barra Olympic Park, which will be one of four homes in Rio de Janeiro for the 2016 Olympic events.

Computer-generated architect's renderings show how construction sites at Barra Olympic Park in Rio de Janeiro will become real venues for the 2016 summer games.

The nearly three-minute video published July 7 to YouTube shows an eagle-eye view of each of the sites in various phases of construction.

It then fades each site into an architect’s computer-generated rendering of what the site should look like come game time.

The video may help relieve some concerns about whether the site will be ready for the events, according to the online swimming magazine Swim Swam.

The stadium construction projects have had several setbacks. Construction worker strikes, pollution and security concerns are among the issues Rio has faced as it prepares to hold the summer games.

Rio 2016

The 2016 Olympics will be the first ever held in South America.

Nevertheless, Rio 2016 reports that the 1.18 million square meters (3.87 million square feet) of venues at Barra Park show significant improvement compared to a previous video released in January.

And Rio 2016 assures athletes, spectators and worldwide fans that the new video demonstrates that the first games ever to be held in South America will go off without a hitch.

   

Tagged categories: Architects; Architecture; Building design; Commercial / Architectural; Commercial Construction; Computer generated modeling; Modernist architecture; Stadiums/Sports Facilities; Video

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved