Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

D+D News

Main News Page


Library Seeks Bids to Turn a New Leaf

Wednesday, February 19, 2014

More items for Maintenance + Renovation

Comment | More

Blount County, TN, is seeking contractors to repaint its modern 64,000-square-foot public library in Maryville.

Bids are due Feb 27. Work is expected to take place between April 18 and April 21; the library will be closed to accommodate the project.

Interior Painting Project

The interior wall surfaces, doorframes, and interior windows of the Blount County Public Library are to be painted with commercial-grade, interior latex paint matched to the existing paint colors, according to project documents. Work will exclude the basement.

Blount County
Vreeland Engineers

The Blount County Public Library was constructed in 2002.

Surface preparation of the walls is required and may include removing excess mortar or dirt.

Contractors will be required to move any furniture, including bookshelves, to access the walls for painting. However, Blount County shall be responsible for removal of any pictures and other small objects obstructing the wall.

About the Library

Built in May 2002, the Blount County Public Library is a 64,000-square-foot building featuring facilities for meetings, conferences, study groups and socializing. It also houses a Bookmark Café.

The exterior of the building is brick, marble and aluminum, locally sourced in Blount County, according to a description of the project by MHM Architects. A key design feature is a clock tower with lantern that denotes the importance of this community center as a landmark, the architect said.

Blount County
http://www.blountlibrary.org/

The library services Blount County’s population of nearly 125,000 residents.

The modern library services Blount County’s population of nearly 125,000 residents.

According to a local news report on the history of the library system, the original 3,000-square-foot A.K. Harper Memorial Library was built in 1931. In 1981, a new library was constructed to meet the demands for materials and services, the report said.

Just over 20 years later, the area’s growing population and library service needs outgrew that location’s 19,500-square-foot space, and the current facility was constructed, the report added.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community.

Get a free trial of Paint BidTracker now.

   

Tagged categories: Bidding; Contract awards; Government contracts; Interior coatings; Paint BidTracker; Painters

Comment from Tom Schwerdt, (2/19/2014, 9:15 AM)

That entrance looks really, really nice. I hope that it is functional as well.


Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved