Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

DURABILITY + DESIGN BLOG

Comment |

Olympic Trials in Architecture

THURSDAY, AUGUST 2, 2012

By Jill M. Speegle


More items for Color + Design

As athletes continue to break records and crowds cheer at the London 2012 Olympics Games, many of the architects, engineers and suppliers involved in Olympics-related work are muted.

They cannot promote their treasures due to a marketing agreement with the Games’ organizers.

New London Architecture, an organization devoted to issues surrounding architects, planners and developers in the capital city, and its chair, Peter Murray, are openly expressing distaste for the Olympic marketing rules.

 Peter Murray shows off his screen-printed shirt bearing the names of the architects and engineers who designed the London Olympics.

 Courtesy of Peter Murray

Peter Murray shows off his screen-printed shirt bearing the names of the architects and engineers who designed the London Olympics.

How is Murray protesting?  Well, he’s parading around in a screen-printed t-shirt that lists all the architects and engineers involved in the London 2012 Olympic Games.

“Only Populous and Atkins, of those commissioned by the Olympic Delivery Authority (ODA),” can showcase their work on the structures because they are “Third Tier” sponsors, Murray told dezeen.

Populous designed the Olympic Stadium.

Protest Setting

Murray chose the July 30 Creative Industries Summit as a protest stage. (The summit is one of 18 being organized by UK Trade & Investment during the Olympic and Paralympic Games to boost British industry and help build partnerships between UK firms and international businesses in advertising, media, design and architecture.)

“Privately, ministers suggest the architects should ignore the ban, but [they] will not say so publicly,” he said.

However, in an e-mail to D+D News, Murray said, he was able to get a government minister to wear the t-shirt at the summit.

A lift on the marketing ban may not be in the cards until next year. And by that time, attention may be on Rio de Janeiro, Brazil, as it will host the 2016 Summer Olympic Games.

So, where do your opinions veer in this Olympic trial?

ABOUT THE BLOGGER

Jill M. Speegle

Jill Speegle is the Editor of Durability + Design News. She earned her B.A. in journalism and English as well as her J.D. from the University of Arkansas. In Sketches, Jill shares her thoughts on a number of topics that may be of interest to the D+D community, including architecture, interior design, green building, historic restoration, and whatever else catches her radar.

SEE ALL CONTENT FROM THIS CONTRIUBTOR

   

Tagged categories: Architects; Architecture; Color; Designers; Engineers

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Shield Industries, Inc
 
FireGuard® E-84 Intumescent Coating - Shield Industries, Inc
 
Trust the certified protection of the industry’s most innovative intumescent coating FireGuard® E-84 to provide you with the 1 and 2 hour fire ratings you need.
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Keim Mineral Coatings
 
Mineral Silicate Paints + Stains Fuse to Concrete
 
• Forms permanent chemical bonds
• Becomes part of the concrete
• Will never peel
• Looks completely natural
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved