Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Paint BidTracker


D+D News

Main News Page


WI Arena Nears 80% Mark, Exterior Finishes

Thursday, February 1, 2018

More items for Building Envelope

Comment | More

News outlets out of Wisconsin are reporting that the $524 million Milwaukee Bucks arena is nearing 80 percent completion, with its target of opening in the fall still in sight.

The Journal Sentinel released an updated drone video of the site and noted that a portion of the building is an unexpected vibrant shade of green.

A Mortenson spokesperson confirmed that the color comes from the air and vapor barrier. The area is the last that still needs to be covered up by a combination of zinc panels, composite panels, corrugated panels and curtainwall.

There are currently about 665 workers on site, and events at the arena are scheduled as early as Sept. 13. Construction on the rest of the entertainment space will take place this spring.

About the Project

The 714,000-square-foot multi-use facility will feature a grand entry, intimate seating and open concourses and will be covered in that zinc patina exterior, punctuated by glass cutouts.

Populous

The last that of the exterior still needs to be covered up by a combination of zinc panels, composite panels, corrugated panels and curtainwall.

“The hand-crafted zinc and glass exterior wraps the energy of a multi-purpose arena full of social gathering spaces and a new public plaza extends the development as a year-round catalyst for the transformation of downtown Milwaukee,” said Brad Clark, senior principal at Populous, which was tapped as the design lead early in 2016 (along with Wisconsin-based firms Eppstein Uhen and HNTB).

The look of the panels was met with criticism, some calling it too “rustic.” Designers maintained that it will make the arena a unique feature to the cityscape and borrows from the region’s natural environment of rivers, lakes and forests.

   

Tagged categories: Air barriers; Commercial Construction; Glass; Stadiums/Sports Facilities; Wood composites; Zinc

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
PPG Paints
 
PPG PAINTS™ SPEEDHIDE® INTERIOR LATEX
 
This high-hiding, low-VOC, low-odor paint enables a space to be painted while occupied and delivers the durable product performance professionals require.
 

 
Digital Facilities Corporation
 
Manage Wall Systems with
FM-Pro
 
FM-Pro™ is designed with a comprehensive wall asset area module to inventory and manage Wall systems, including fenestration details, and is suited for building owners, façade area consultants, and product suppliers.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved