Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Keim Mineral Coatings


D+D News

Main News Page


Improvements Needed for CA Senior/Community Center

Tuesday, January 16, 2018

More items for Maintenance + Renovation

Comment | More

The City of Banning, California, is seeking proposals for 7,300 square feet of scheduled improvements to the Banning Community Center and Senior Center. The center serves the municipalities of Banning, Beaumont, Cabazon, Calimesa and Cherry Valley in Riverside County. The center includes a gymnasium, kitchen area and meeting rooms.

Bids are due Jan. 25. 

Scope of Work 

The work includes removing and replacing cast-in-place concrete for new exterior ramps, stairs and various interior flooring. Newly installed concrete surfaces will be cleaned by abrasive blast-cleaning and receive an acrylic-based cement-hardening system. The ramp will receive approximately 115 SF of an epoxy-based system.

Banning Community Center and Senior Center

The City of Banning, California, is seeking proposals for 7,300 square feet of scheduled improvements to the Banning Community Center and Senior Center. The center serves the municipalities of Banning, Beaumont, Cabazon, Calimesa and Cherry Valley in Riverside County. The center includes a gymnasium, kitchen area and meeting rooms.

After completing concrete work, the new exterior stairs and ramp will have epoxy-coated steel handrails installed.

The contractor is also required to replace the roof. All damaged soffit wood trims, fascia and framing are to be replaced and recoated with an exterior treatment application to match the existing wood surfaces.

The center’s restroom facilities will also require renovation including replacing walls, ceilings and gypsum boards.  New ceilings and walls will be painted with an acrylic coating system. Interior wood surfaces and cabinets in the kitchen and various offices will be cleaned and coated with an alkyd-enamel system.

Owner-specified brands include Benjamin Moore, Comex Group, Duron, ICI Devoe, Glidden, PPG and Sherwin-Williams or approved equal.

Commencement of work is expected to be complete within 50 working days after an award is made.

The estimated cost of this project is $343,920.

Reported by Paint BidTracker, a construction reporting service devoted to identifying contracting opportunities for the coatings community. Try Paint BidTracker free!

   

Tagged categories: Bidding; Contract awards; Contracts; Government; Government contracts; Jobs; Paint BidTracker

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
Digital Facilities Corporation
 
Manage Wall Systems with
FM-Pro
 
FM-Pro™ is designed with a comprehensive wall asset area module to inventory and manage Wall systems, including fenestration details, and is suited for building owners, façade area consultants, and product suppliers.
 

 
PPG Paints
 
PPG PAINTS™ SPEEDHIDE® INTERIOR LATEX
 
This high-hiding, low-VOC, low-odor paint enables a space to be painted while occupied and delivers the durable product performance professionals require.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2018, Technology Publishing Co., All rights reserved