Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Paint BidTracker


D+D News

Main News Page


Mercedes-Benz Stadium Officially Achieves LEED Platinum

Thursday, November 30, 2017

More items for Building Envelope

Comment | More

On Sunday (Nov. 26), the project team for Atlanta’s Mercedes-Benz Stadium was presented with its LEED Platinum plaque, officially cementing the structure’s status as the first LEED Platinum sports stadium in North America.

Under general contractor HHRM JV (a joint venture of Holder Construction Company, Hunt Construction Group, H.J. Russell & Company and C.D. Moody Construction Company) with design by international architecture and engineering firm HOK, the 2-million-square-foot, $1.5 billion stadium acquired 88 points to achieve the milestone.

HOK

Under general contractor HHRM JV (a joint venture of Holder Construction Company, Hunt Construction Group, H.J. Russell & Company and C.D. Moody Construction Company) and design by international architecture and engineering firm HOK, the 2-million-square foot, $1.5 billion stadium acquired 88 points to achieve the milestone.

“We set out to build a venue that would not only exceed expectations, but also push the limits of what was possible in terms of stadium design, fan experience and sustainability,” said Arthur Blank, Atlanta Falcons and Atlanta United owner and chairman.

Design & Achievements

The facility is best known for its one-of-a-kind, camera-style retractable roof, but water and lighting are what earned the stadium the bulk of its credits.

According to an HOK press release, key sustainability characteristics include:

  • First sports stadium to receive all water category credits, due in large part to a highly advanced storm water management system;
  • The stadium uses 47 percent less water than baseline standards due to water-efficient fixtures and conservation infrastructure;
  • The stadium generates renewable power with its 4,000 solar PV panels;
  • The stadium features LED lighting, which will last 10 times longer than standard lights and reduce energy use by as much as 60 percent;
  •  A 680,000-gallon underground cistern collects rainwater that is repurposed for irrigation and to help run the stadium’s cooling towers (community organization Trees Atlanta has access to the cistern to water its trees);
  • There’s also a stormwater vault that can hold 1.2 million gallons of water in an effort to reduce stormwater runoff and flooding in the neighborhoods surrounding the stadium;
  • Alternative transportation options—including a bike valet program on event days, EV charging stations with capacity to charge up to 48 electric cars simultaneously and new pedestrian-friendly walking paths allowing for more connectivity between communities;
  • Leads the NFL with the highest percentage of fans using public transportation to attend Falcons games—thanks to convenient access to public transportation;
  • Innovative local food production features such as edible landscaping, an urban garden currently in development and partnership with local organizations to train Westside residents in culinary arts and help place them in living-wage jobs in the industry; and
  • A 13-acre green space under development adjacent to Mercedes-Benz Stadium will offer game-day parking and tailgating, as well as arts and cultural events, entertainment and community building on non-event days.

“We set a goal of achieving the highest LEED rating because it was the right thing to do for our city and the environment,” Blank continued. “With this achievement, we have a powerful new platform to showcase to the industry and to our fans that building sustainably and responsibly is possible for a venue of any type, size and scale.”

   

Tagged categories: Environmentally friendly; Green building; LEED; Stadiums/Sports Facilities

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
International Roofing Expo
 
IRE 2018
 
Attend the IRE where exhibitors and education offer serious solutions, real results and opportunities to make powerful connections. Register for FREE Expo.
 

 
PPG Paints
 
PPG PAINTS™ SPEEDHIDE® INTERIOR LATEX
 
This high-hiding, low-VOC, low-odor paint enables a space to be painted while occupied and delivers the durable product performance professionals require.
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
World of Concrete
 
WOC 2018 – Las Vegas, NV
 
Visit the WOC website for more details about the World of Concrete 2018: January 23-26; Seminars 22-26 at the Las Vegas Convention Center in Las Vegas, NV, USA.
 

 
EMME Controls
 
EMME (Energy Management Made Easy)
 
We are a manufacturer of a temperature control & energy management system which works with most any existing heating & cooling equipment, providing significant value/impact as it relates to comfort & energy savings.
 

 
A&I Coatings
 
Seal n Peel Strippable Coatings
 
Protect your assets with Seal n Peel. Easy to apply and remove. Can be left on for up to 12 months. Water based, enviro mentally friendly.
 

 
Digital Facilities Corporation
 
Manage the Building Envelope
 
FM-Pro™ is an innovative solution for the assessment and management of Roofing, Facade and Paving for building owners, asset area consultants, and product suppliers.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2017, Technology Publishing Co., All rights reserved