Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Keim Mineral Coatings


D+D News

Main News Page


Philly Museum Begins Gehry's Nearly $200M Renovation

Monday, April 10, 2017

More items for Maintenance + Renovation

Comment | More

The Philadelphia Museum of Art has begun “unclogging its arteries” with the recent groundbreaking of the Core Project—a $196 million plan that will add a grand total of 90,000 square feet to the 100-year-old museum.

The Core Project

Led by award-winning architect Frank Gehry, the transformation of the museum’s main building will include 67,000 square feet of new public space, 11,500 square feet of gallery space and another 11,500 square feet of contemporary art display space.

Architectural renderings: Gehry Partners LLP and KX-L

The construction will involve the removal of the museum’s auditorium, opening up a new main, multi-level space intended to be called “the Forum,” which will serve as a place for public gathering.

Gehry’s plan, essentially, is to open everything up, keeping in line with the classicism with which the building was originally constructed (he referenced the original firms Horace Trumbauer and Zantzinger, Borie and Medary, who designed the building in the 1920s).

"[Trumbauer and ZBM] left an incredible architectural legacy," Gehry said during the groundbreaking. "The DNA, the bones of this place are really fantastic for the present and the future. … It just showed us the way to make it all work. We had to uncork a few cloggy arteries and clarify."

In a video clip associated with the museum’s press release on the construction, museum officials noted the need for a more open space, infrastructure improvements and basic reorganization.

“Sometimes it’s fun to get lost in a museum,” said Marla Shoemaker, one of the museum’s curators. “But sometimes it’s fun to be able to get to the place that you’d like to go.”

Gehry was approached by former museum director Annie d’Harnoncourt in 2006 for the project following his success with the Guggenheim Museum in Bilbao, Spain. He recalled that she asked him to do the same thing, except with the restrictions of only working on the inside.

"Nice challenge," Gehry said. "I had just done the other, so I thought, 'Why not? Let's try.’"

The construction—managed by LF Driscoll Company LLC—will involve the removal of the museum’s auditorium, opening up a new main, multi-level space intended to be called “the Forum,” which will serve as a place for public gathering. A new staircase will pass through and connect visitors to the 640-foot-long vaulted walkway above, which has been closed to visitors for decades.

The west terrace will be rebuilt to integrate ramps the north entrance will be reopened. Also being added into the interior are new classrooms, art studios, a restaurant, café, meetings rooms and new art galleries.

‘It Starts Here’ Campaign

The Core Project is the second part of Gehry’s three-phase Facilities Master Plan. The first project was a new Art Handling Facility, which was completed in 2012. The next phase involves converting the attic for public use.

A new staircase will pass through and connect visitors to the 640-foot-long vaulted walkway above, which has been closed to visitors for decades.

The Master Plan is part of a bigger effort in the “It Starts Here: Campaign for the Philadelphia Museum of Art,” which will allow the museum to “achieve ambitious goals in education and public programming, improved access and community outreach, and the innovative use of new technologies to fulfill its mission and more effectively engage the next generation of audiences, locally as well as internationally,” according to the press release.

The fundraising campaign is the largest in Philadelphia’s history, according to the museum, and so far, it has raised $326 million of its $525-million goal.

The Core Project is expected to take about three years to complete, with the new spaces to open in phases as they’re finished until Fall 2020. The museum will remain open to the public throughout the whole construction process.

   

Tagged categories: Architecture; Construction; Design; Design build; Frank Gehry; Public spaces

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
KTA-Tator, Inc. - Corporate Office
 
KTA Inspection Services
 
Determine Specification Compliance:
• Surface Preparation
• Moisture Content
• Paint Materials & Application
• Aesthetics
Contact: Kevin Brown,
336-386-4000
 

 
Novatek Corporation
 
Novatek Portable Air Filtration Systems
 
Air Scrubbers/Negative Air machines for restoration, abatement, dust & odor control, hazardous contaminant removal from job sites to clean rooms and hospitals. Portable, affordable!
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
LATICRETE International, Inc.
 
Resinous and Decorative Finishes
 
SPARTACOTE® resinous flooring and decorative finishes by LATICRETE® offer unparalleled colors, textures, and finishes. These high performance coatings give you exceptionally attractive, durable and decorative floors. SPARTACOTE decorative finishes allow you to deliver vivid colors and gloss with high impact and wear resistance, quick turnaround, and low maintenance. Choose from products such as polyaspartic coatings, epoxy coatings, customizable decorative finishes, traction additives and vapor reduction for your industrial, commercial or residential flooring applications.
 

 
 
 

Technology Publishing Co., 2100 Wharton Street, Suite 310, Pittsburgh PA 15203-1951

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2017, Technology Publishing Co., All rights reserved