Durability + Design
Follow us on Twitter Follow us on LinkedIn Like us on Facebook Follow us on Instagram Visit the TPC Store
Search the site

 

Advertisement

Keim Mineral Coatings


D+D News

Main News Page


Philly Museum Begins Gehry's Nearly $200M Renovation

Monday, April 10, 2017

More items for Maintenance + Renovation

Comment | More

The Philadelphia Museum of Art has begun “unclogging its arteries” with the recent groundbreaking of the Core Project—a $196 million plan that will add a grand total of 90,000 square feet to the 100-year-old museum.

The Core Project

Led by award-winning architect Frank Gehry, the transformation of the museum’s main building will include 67,000 square feet of new public space, 11,500 square feet of gallery space and another 11,500 square feet of contemporary art display space.

Architectural renderings: Gehry Partners LLP and KX-L

The construction will involve the removal of the museum’s auditorium, opening up a new main, multi-level space intended to be called “the Forum,” which will serve as a place for public gathering.

Gehry’s plan, essentially, is to open everything up, keeping in line with the classicism with which the building was originally constructed (he referenced the original firms Horace Trumbauer and Zantzinger, Borie and Medary, who designed the building in the 1920s).

"[Trumbauer and ZBM] left an incredible architectural legacy," Gehry said during the groundbreaking. "The DNA, the bones of this place are really fantastic for the present and the future. … It just showed us the way to make it all work. We had to uncork a few cloggy arteries and clarify."

In a video clip associated with the museum’s press release on the construction, museum officials noted the need for a more open space, infrastructure improvements and basic reorganization.

“Sometimes it’s fun to get lost in a museum,” said Marla Shoemaker, one of the museum’s curators. “But sometimes it’s fun to be able to get to the place that you’d like to go.”

Gehry was approached by former museum director Annie d’Harnoncourt in 2006 for the project following his success with the Guggenheim Museum in Bilbao, Spain. He recalled that she asked him to do the same thing, except with the restrictions of only working on the inside.

"Nice challenge," Gehry said. "I had just done the other, so I thought, 'Why not? Let's try.’"

The construction—managed by LF Driscoll Company LLC—will involve the removal of the museum’s auditorium, opening up a new main, multi-level space intended to be called “the Forum,” which will serve as a place for public gathering. A new staircase will pass through and connect visitors to the 640-foot-long vaulted walkway above, which has been closed to visitors for decades.

The west terrace will be rebuilt to integrate ramps the north entrance will be reopened. Also being added into the interior are new classrooms, art studios, a restaurant, café, meetings rooms and new art galleries.

‘It Starts Here’ Campaign

The Core Project is the second part of Gehry’s three-phase Facilities Master Plan. The first project was a new Art Handling Facility, which was completed in 2012. The next phase involves converting the attic for public use.

A new staircase will pass through and connect visitors to the 640-foot-long vaulted walkway above, which has been closed to visitors for decades.

The Master Plan is part of a bigger effort in the “It Starts Here: Campaign for the Philadelphia Museum of Art,” which will allow the museum to “achieve ambitious goals in education and public programming, improved access and community outreach, and the innovative use of new technologies to fulfill its mission and more effectively engage the next generation of audiences, locally as well as internationally,” according to the press release.

The fundraising campaign is the largest in Philadelphia’s history, according to the museum, and so far, it has raised $326 million of its $525-million goal.

The Core Project is expected to take about three years to complete, with the new spaces to open in phases as they’re finished until Fall 2020. The museum will remain open to the public throughout the whole construction process.

   

Tagged categories: Architecture; Construction; Design; Design build; Frank Gehry; Public spaces

Comment Join the Conversation:

Sign in to our community to add your comments.

Advertisements
 
RCI, Inc.
 
RCI Building Envelope Technology Symposium
 
November 13-14, 2017 | Orlando, Florida | Learn valuable design and repair insights from 20 leading design experts. RCI, Inc. is an AIA LU provider. Learn more.
 

 
A&I Coatings
 
Vitreflon – the hallmark of colour stable protective coatings
 
Vitreflon two pack fluoropolymer coatings display unsurpassed colour and gloss retention making Vitreflon the coating of choice for high value infrastructure and architecture. Contact us today to find out how Vitreflon can outperform on your next project. Vitreflon distributorships available.
 

 
CONSTRUCT (by CSI)
 
Free Expo Pass to CONSTRUCT 2017
 
CONSTRUCT is the only dedicated national trade show and educational conference for the commercial building teams that spec and source building products. CONSTRUCT links thousands of industry leaders to procure real-world, practical knowledge for building success.
 

 
PPG Paints
 
PURE PERFORMANCE® Interior Latex Paint
 
PPG PAINTS™ Pure Performance interior latex paint delivers a durable finish. Its zero-VOC,* low-odor formula makes it ideal for schools, hotels, hospitals, office buildings, retail spaces, home residences and more. *Colorants added to this base paint may increase VOC level significantly depending on color choice.
 

 
Atlas Material Testing Technology
 
Helping You Put Your Products To The Test
 
  • Outdoor Accelerated Weathering
  • Laboratory Testing Services
  • Accelerated Weathering Instruments

  • www.atlas-mts.com
    atlas.info@ametek.com
 

 
Pratt & Lambert Paints
 
Trusted Performance with Proven Results
 
Pratt & Lambert’s finest, Accolade® Premium Paint & Primer, applies flawlessly with superb hide and long-lasting durability for great results, every time.
 

 
 
 

Technology Publishing Co., 1501 Reedsdale Street, Suite 2008, Pittsburgh, PA 15233

TEL 1-412-431-8300  • FAX  1-412-431-5428  •  EMAIL webmaster@durabilityanddesign.com


The Technology Publishing Network

Durability + Design PaintSquare the Journal of Protective Coatings & Linings Paint BidTracker

 

© Copyright 2012-2017, Technology Publishing Co., All rights reserved